During our intense month of summer research, there will be 7 model forecast cycles run by the ROMS. Below we have listed those cycles for which we have created a 3 day forecast. There are several ensemble forecast runs per cycle. Each utilizing either K-Profile Parameterization or Mellor-Yamada Level 2.5 vertical mixing scheme. ROMS is forced with high resolution COAMPS (research) and coarse resolution COAMPS (operational).
Click on the modeling scheme below to see the results of the model product.
|
Atmospheric Forcing
|
HR COAMPS | LR COAMPS | ||||
|
Initial Conditions
|
Ensemble | Ensemble | ||||
| Forecast Cycle 1: | July 11 - July 13 | KPP | MY2.5 | |||
| Forecast Cycle 2: | July 15 - July 17 | KPP | MY2.5 | |||
| Forecast Cycle 3: | July 18 - July 20 | KPP | MY2.5 | |||
| Forecast Cycle 4: | July 22 - July 24 | KPP | MY2.5 | |||
| Forecast Cycle 5: | July 25 - July 27 | KPP | MY2.5 | |||
| Forecast Cycle 6: | July 29 - July 31 | KPP | MY2.5 | |||
| Forecast Cycle 7: | August 1 - August 3 | KPP | MY2.5 | KPP | MY2.5 | |
| Forecast Cycle 8: | August 5 - August 7 | KPP | MY2.5 | |||
Model Domain and bathymetry (meters)
Zoom of grid and bathymetry at LEO-15
Send questions, comments or errors to: